Component traceability, BOM management, and production scheduling for PCB assembly, SMT lines, and electronics manufacturing.
Electronics assemblies can have hundreds of unique components per board. Tracking which reel or tray fed which production run — and linking that back to supplier lot codes — is nearly impossible in spreadsheets. Axis tracks every component from receiving through placement to final assembly.
Engineering changes a resistor value or swaps a connector. If the BOM update does not propagate cleanly, the floor builds to the wrong revision. Axis build plans carry full revision history — when a new rev releases, existing work orders stay on the prior rev while new orders pick up the change automatically.
SMT lines have finite capacity. When multiple jobs compete for the same placement machine, scheduling conflicts eat into throughput. Axis work orders with target dates and calendar visibility let you see every job across every line — no more whiteboard scheduling.
Customers demand RoHS and REACH declarations. Gathering compliance certificates across hundreds of components is a manual ordeal. Axis lets you attach compliance documents directly to inventory items and pull them into records tied to the finished assembly.
QOH, Allocated, and Available for every reel, tray, and tube. When a work order releases, materials allocate automatically. When production runs, stock adjusts in real time — no manual deductions.
Build plans carry revision history with owner, approver, and effective date. When a revision releases, it automatically flows to new work orders while existing orders stay on the prior rev.
Build plan operations detail every step — solder paste application, SMT placement, reflow, manual insertion, inspection, and test. Each operation has estimated time, work center, and step-by-step instructions.
The records module captures ICT results, functional test data, and final inspection outcomes. Each record is linked to the work order, lot, and inspector — ready for customer review at any time.
Assign lot numbers at receiving and track consumption through work orders. Link each component lot to its supplier cert, date code, and the finished assemblies it went into.
Every action is logged — who did what, when, and to which record. The audit log is append-only. No deletions, no overwrites — exactly what compliance auditors want to see.